{"id":3174,"date":"2022-12-14T08:08:18","date_gmt":"2022-12-14T06:08:18","guid":{"rendered":"https:\/\/crisuri.rowater.ro\/?p=3174"},"modified":"2022-12-14T08:08:43","modified_gmt":"2022-12-14T06:08:43","slug":"acumularea-lesu-va-beneficia-de-fonduri-pnrr","status":"publish","type":"post","link":"https:\/\/crisuri.rowater.ro\/?p=3174","title":{"rendered":"Acumularea Le\u0219u va beneficia de fonduri PNRR"},"content":{"rendered":"<p><strong>Administra\u021bia Bazinal\u0103 de Ap\u0103<\/strong><strong> Cri\u0219uri a preg\u0103tit un portofoliu de \u0219ase acumul\u0103ri <\/strong><strong>care vor beneficia de <\/strong><strong>finan\u021bare \u00een cadrul Planului Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 <\/strong><strong>\u00a0(PNRR).<\/strong><\/p>\n<p>Printre primele proiecte care va beneficia de finan\u021bare este cel care vizeaz\u0103 \u00eembun\u0103t\u0103\u021birea condi\u021biilor de exploatare \u00een siguran\u021b\u0103 a acumul\u0103rii Le\u0219u din jude\u021bul Bihor. Amplasat pe Valea Iad, amonte de localitatea Reme\u021bi, barajul acumul\u0103rii, av\u00e2nd o \u00een\u0103l\u021bime de 60,50 m \u0219i o lungime la coronament\u00a0 de 180 m, va fi rebilitat dup\u0103 cele mai moderne standarde.<\/p>\n<p>\u00cen prezent, acumularea Le\u015fu nu are reten\u0163ie de ap\u0103 \u00eentruc\u00e2t lacul a fost golit, \u00een anul 2015, datorit\u0103 exfiltra\u0163iilor foarte mari care amenin\u021bau func\u021bionarea \u00een siguran\u021b\u0103 a acestuia. Acumularea Le\u0219u a fost executat\u0103 \u0219i pus\u0103 \u00een func\u021biune \u00een perioada 1973-1978 ca acumulare permanent\u0103, cu rol complex, av\u00e2nd\u00a0 urm\u0103toarele folosin\u0163e: ap\u0103rare \u00eempotriva inunda\u021biilor a localitatilor Reme\u021bi, Munteni, Bulz, Bratca \u0219i Balnaca, alimentare cu ap\u0103 pentru amenajare piscicol\u0103 \u0219i producere de energie electric\u0103.<\/p>\n<p><em>\u201dPentru cre\u0219terea gradului de siguran\u021b\u0103 \u00een exploatare \u0219i asigurarea unui ciclu de func\u021bionare de 30 ani sunt necesare lucr\u0103rile ample de reabilitare \u0219i \u00eenlocuire a componentelor hidrotehnice. \u00cen conformitate cu legisla\u021bia \u00een vigoare, p\u00e2n\u0103 \u00een prezent, s-a facut expertiza cu scopul <\/em><em>de a evalua starea tehnic\u0103 a lucr\u0103rilor existente, precum \u0219i formularea de concluzii \u0219i recomand\u0103ri referitoare la m\u0103suri sau solu\u021bii de interven\u021bie necesare \u00eembun\u0103t\u0103\u021birii condi\u021biilor de func\u021bionare \u00een siguran\u021ba a acumul\u0103rii.<\/em> <em>Pentru exploatarea barajului la parametrii nominali, se va asigura \u00een primul r\u00e2nd etan\u0219eitatea m\u0103\u0219tii amonte cu o geomembran\u0103 \u0219i \u00eenlocuirea echipamentelor hidromecanice. Monitorizarea comport\u0103rii barajului va presupune urm\u0103rirea cu laser- scaner a deforma\u021biilor m\u0103\u0219tii, iar <\/em><em>independen\u021ba energetic\u0103 necesar\u0103 pentru func\u021bionarea echipamentelor se va asigura prin panouri fotovoltaice.<\/em><strong><em>\u201d<\/em><\/strong> P\u00e1sztor S\u00e1ndor, director ABA Cri\u0219uri<\/p>\n<p><strong>\u00a0<\/strong>Proiectul va pune obligatoriu \u00een aplicare toate m\u0103surile de atenuare, fezabile din punct de vedere tehnic \u0219i relevante din punct de vedere ecologic, pentru a reduce impactul negativ asupra apei, precum \u0219i asupra habitatelor \u0219i a speciilor protejate care depind direct de ap\u0103. Astfel sunt prev\u0103zute m\u0103suri pentru asigurarea conectivit\u0103\u021bii longitudinale (sc\u0103ri de pe\u0219ti, by-pass-uri), asigurarea debitului ecologic pe cursul de ap\u0103, precum \u0219i prevenirea eutrofizarii lacului de acumulare. Nu \u00een ultimul r\u00e2nd, prin proiect sunt prev\u0103zute \u0219i sisteme de colectare a de\u0219eurilor. Investi\u021bia are o valoarea de 96.637.013 lei cu termen de realizare anul 2026 \u0219i se afl\u0103 \u00een procedura de achizi\u021bie servicii de proiectare<strong>.<\/strong><\/p>\n<p><strong>\u00a0<\/strong>\u00cen total, prin finan\u021barea PNRR, ABA Cri\u0219uri va \u00eembun\u0103t\u0103\u021bi condi\u021biile de func\u021bionare \u00een siguran\u021b\u0103 pentru \u0219ase acumul\u0103ri din jude\u021bele Bihor \u0219i Arad \u0219i anume: Le\u0219u, S\u0103lard, T\u0103ma\u0219da (BH), Chigher, \u0218icula \u0219i Zerindu Mic (AR). Lucr\u0103rile vizeaz\u0103 zonele prioritare de interven\u021bie a\u0219a cum au fost identificate pe baza planurilor de prevenire \u0219i reducere a riscului la inunda\u021bii.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3176\" src=\"https:\/\/crisuri.rowater.ro\/wp-content\/uploads\/2022\/12\/IMG_5427-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/crisuri.rowater.ro\/wp-content\/uploads\/2022\/12\/IMG_5427-300x225.jpg 300w, https:\/\/crisuri.rowater.ro\/wp-content\/uploads\/2022\/12\/IMG_5427-768x576.jpg 768w, https:\/\/crisuri.rowater.ro\/wp-content\/uploads\/2022\/12\/IMG_5427.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Administra\u021bia Bazinal\u0103 de Ap\u0103 Cri\u0219uri a preg\u0103tit un portofoliu de \u0219ase acumul\u0103ri care vor beneficia de finan\u021bare \u00een cadrul Planului Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 \u00a0(PNRR). Printre primele proiecte care\u2026<\/p>\n","protected":false},"author":1,"featured_media":3175,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3174","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/posts\/3174","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3174"}],"version-history":[{"count":2,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/posts\/3174\/revisions"}],"predecessor-version":[{"id":3178,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/posts\/3174\/revisions\/3178"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/media\/3175"}],"wp:attachment":[{"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}