{"id":7823,"date":"2025-04-08T13:21:15","date_gmt":"2025-04-08T11:21:15","guid":{"rendered":"https:\/\/crisuri.rowater.ro\/?p=7823"},"modified":"2025-04-08T13:21:15","modified_gmt":"2025-04-08T11:21:15","slug":"administratia-bazinala-de-apa-crisuri-a-desemnat-ofertele-castigatoare-pentru-pistele-cicloturistice-amenajate-pe-diguri","status":"publish","type":"post","link":"https:\/\/crisuri.rowater.ro\/?p=7823","title":{"rendered":"Administra\u021bia Bazinal\u0103 de Ap\u0103 Cri\u0219uri a desemnat ofertele c\u00e2\u0219tig\u0103toare pentru pistele cicloturistice amenajate pe diguri"},"content":{"rendered":"<p>Administra\u021bia Bazinal\u0103 de Ap\u0103 Cri\u0219uri a finalizat procesul de evaluare a celor 49 de oferte depuse \u00een Sistemul Electronic de Achizi\u021bii Publice pentru execu\u021bia lucr\u0103rilor de amenajare a digurilor \u00een vederea realiz\u0103rii de trasee cicloturistice. Analiza ofertelor a fost realizat\u0103 \u00eentr-un interval de mai pu\u021bin de dou\u0103 luni.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Un proiect cu multiple beneficii pentru comunitate \u0219i mediu<\/strong><\/p>\n<p>Proiectul prevede amenajarea de piste pentru biciclete pe digurile de ap\u0103rare \u00eempotriva inunda\u021biilor, \u00eemp\u0103r\u021bite \u00een cinci loturi, corespunz\u0103toare r\u00e2urilor: Ier, Barc\u0103u, Cri\u0219ul Repede, Canal Colector \u0219i Cri\u0219ul Negru. Aceast\u0103 investi\u021bie aduce beneficii semnificative at\u00e2t pentru protec\u021bia mediului, c\u00e2t \u0219i pentru comunit\u0103\u021bile locale. Pe l\u00e2ng\u0103 consolidarea malurilor \u0219i \u00eembun\u0103t\u0103\u021birea accesului pe coronamentele digurilor, proiectul va contribui la protec\u021bia \u00eempotriva inunda\u021biilor \u0219i la dezvoltarea infrastructurii moderne pentru ciclism.<\/p>\n<p>&nbsp;<\/p>\n<p>\u201e<em>Contractele vor fi semnate dup\u0103 expirarea termenului legal de 10 zile pentru eventuale contesta\u021bii, iar lucr\u0103rile trebuie finalizate p\u00e2n\u0103 la data de 30 noiembrie 2025. Pistele vor fi proiectate \u0219i realizate astfel \u00eenc\u00e2t s\u0103 \u00eembun\u0103t\u0103\u021beasc\u0103 func\u021bionalitatea lucr\u0103rilor hidrotehnice cu rol de ap\u0103rare impotriva inunda\u021biilor \u0219i s\u0103 permit\u0103 \u00een continuare accesul echipelor noastre \u00een caz de viituri sau pentru \u00eentre\u021binerea periodic\u0103 a digurilor\u201d,<\/em> a declarat <strong>P\u00e1sztor S\u00e1ndor<\/strong>, directorul Administra\u021biei Bazinale de Ap\u0103 Cri\u0219uri.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Piste moderne, sigure \u0219i accesibile<\/strong><\/p>\n<p>Traseele cicloturistice vor avea o lungime total\u0103 de 191,325 km, cu l\u0103\u021bimi cuprinse \u00eentre 2 \u0219i 2,4 metri. Acestea vor fi realizate cu un strat de 10 cm de macadam, oferind condi\u021bii excelente \u0219i sigure pentru bicicli\u0219ti. De asemenea, vor fi construite pasarele pentru a asigura continuitatea traseelor acolo unde digurile sunt intersectate de afluen\u021bi.<\/p>\n<p>&nbsp;<\/p>\n<p>Valoarea total\u0103 estimat\u0103 a lucr\u0103rilor aferente proiectului \u201eReabilitarea coronamentului digurilor de ap\u0103rare \u015fi crearea infrastructurii traseelor cicloturistice \u00een Bazinul Hidrografic Cri\u0219uri (LOT 1-5)\u201d este de 79.491.844,3 lei, finan\u021barea fiind asigurat\u0103 prin Planul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR), Componenta C11 \u2013 Turism \u0219i cultur\u0103.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Caset\u0103 tehnic\u0103 \u2013<\/strong> oferte c\u0103\u0219tig\u0103toare- Loturi (1-5)<\/p>\n<table style=\"height: 1238px;\" width=\"1331\">\n<tbody>\n<tr>\n<td width=\"34\"><strong>Nr. Crt <\/strong><\/td>\n<td width=\"216\"><strong>Denumire LOT<\/strong><\/td>\n<td width=\"209\"><strong>Denumire asociere cu oferta c\u0103\u0219tig\u0103toare<\/strong><\/td>\n<td width=\"162\"><strong>Valoare ofertata<\/strong><\/p>\n<p><strong>\u00a0(lei fara TVA)<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"34\">1<\/td>\n<td width=\"216\"><strong>LOT 1<\/strong><\/p>\n<p>,,REABILITAREA CORONAMENTULUI DIGURILOR DE AP\u0102RARE \u0218I CREAREA INFRASTRUCTURII PENTRU TRASEE CICLOTURISTICE \u00ceN B.H. CRI\u0218URI\u201d &#8211; Obiectul 1<strong>. &#8211; Dig mal st\u00e2ng Valea Ier, Sector Andrid &#8211; Ianca<\/strong><\/p>\n<p>&nbsp;<\/td>\n<td width=\"209\"><strong>Asocierea<\/strong><\/p>\n<p>SC SENERA SA \u2013 lider<\/p>\n<p>SC CITADINA 98 SA\u2013 asociat<\/p>\n<p>SC ABED NEGO COM SRL \u2013 subcontractant<\/td>\n<td width=\"162\">15.246.397,69<\/td>\n<\/tr>\n<tr>\n<td width=\"34\">2<\/td>\n<td width=\"216\"><strong>LOT 2<\/strong><\/p>\n<p>,,REABILITAREA CORONAMENTULUI DIGURILOR DE AP\u0102RARE \u0218I CREAREA INFRASTRUCTURII PENTRU TRASEE CICLOTURISTICE \u00ceN B.H. CRI\u0218URI\u201d &#8211; Obiectul 2. &#8211; <strong>Dig mal drept r\u00e2ul Barc\u0103u \u0219i v. \u00cenot, sector Marghita-Frontier\u0103<\/strong><\/p>\n<p>&nbsp;<\/td>\n<td width=\"209\"><strong>Asocierea<\/strong><\/p>\n<p>SC GAVELLA COM SRL \u2013 lider<\/p>\n<p>SC CONSTRUCTORUL SALARD SRL\u2013 asociat<\/p>\n<p>SC DRUMURI ORASENESTI\u00a0 SA \u2013 asociat<\/p>\n<p>SC NEDEA CONST SRL \u2013 asociat<\/p>\n<p>SC DRUMURI BIHOR SA \u2013 asociat<\/p>\n<p>SC SELINA SRL \u2013 asociat<\/td>\n<td width=\"162\">13.377.852,47<\/td>\n<\/tr>\n<tr>\n<td width=\"34\">3<\/td>\n<td width=\"216\"><strong>LOT 3<\/strong><\/p>\n<p>,,REABILITAREA CORONAMENTULUI DIGURILOR DE AP\u0102RARE \u0218I CREAREA INFRASTRUCTURII PENTRU TRASEE CICLOTURISTICE \u00ceN B.H. CRI\u0218URI\u201d &#8211; Obiectul 3. &#8211; <strong>Dig mal drept r\u00e2ul Cri\u0219ul Repede, sector Oradea-Frontier\u0103<\/strong><\/p>\n<p>&nbsp;<\/td>\n<td width=\"209\"><strong>Asocierea<\/strong><\/p>\n<p>S<strong>C <\/strong>DRUMURI BIHOR SA \u2013 lider<\/p>\n<p>SC CONSTRUCTORUL SALARD SRL \u2013 asociat<\/p>\n<p>SC SELINA SRL\u2013 asociat<\/p>\n<p>SC GAVELLA COM SRL \u2013 asociat<\/p>\n<p>SC PRECON TRANSILVANIA SA \u2013 subcontractant<\/td>\n<td width=\"162\">7.841.494,67<\/td>\n<\/tr>\n<tr>\n<td width=\"34\">4<\/td>\n<td width=\"216\"><strong>LOT 4<\/strong><\/p>\n<p>,,REABILITAREA CORONAMENTULUI DIGURILOR DE AP\u0102RARE \u0218I CREAREA INFRASTRUCTURII PENTRU TRASEE CICLOTURISTICE \u00ceN B.H. CRI\u0218URI\u201d &#8211; Obiectul 4. &#8211; Dig mal st\u00e2ng r\u00e2ul Cri\u0219ul Repede, sector pod T\u0103rian &#8211; Dig\u00a0 mal drept Canal Colector \u0219i sector Dig\u00a0 mal drept Canal Colector \u2013 confluen\u021b\u0103 V. Culi\u0219er<\/p>\n<p>&nbsp;<\/td>\n<td width=\"209\"><strong>Asocierea<\/strong><\/p>\n<p>SC SOCOT SA \u2013 lider<\/p>\n<p>SC COPOS CONSTRUC\u021aII SRL \u2013 asociat<\/p>\n<p>SC ATHOS COM SRL\u2013 asociat<\/p>\n<p>&nbsp;<\/td>\n<td width=\"162\">12.111.868,87<\/td>\n<\/tr>\n<tr>\n<td width=\"34\">5<\/td>\n<td width=\"216\"><strong>LOT 5<\/strong><\/p>\n<p>,,REABILITAREA CORONAMENTULUI DIGURILOR DE AP\u0102RARE \u0218I CREAREA INFRASTRUCTURII PENTRU TRASEE CICLOTURISTICE \u00ceN B.H. CRI\u0218URI\u201d &#8211; Obiectul 5. &#8211; <strong>Dig mal drept Canal Colector sector confl. V. Culi\u0219er &#8211; Dig mal drept r\u00e2ul Cri\u0219ul Negru; Dig mal drept r\u00e2ul Cri\u0219ul Negru sector confl Canal Colector \u2013 pod Zerind \u0219i Dig mal st\u00e2ng r\u00e2ul Cri\u0219ul Negru, sector pod Zerind \u2013 Frontier\u0103<\/strong><\/td>\n<td width=\"209\"><strong>Asocierea<\/strong><\/p>\n<p>SC LAURENTIU H\u00a0 SRL \u2013 lider<\/p>\n<p>SC ROMAIR CONSULTING SRL \u2013 asociat<\/p>\n<p>SC LEKO CONSTRUCT SRL\u2013 asociat<\/td>\n<td width=\"162\">12.092.802,53<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Administra\u021bia Bazinal\u0103 de Ap\u0103 Cri\u0219uri a finalizat procesul de evaluare a celor 49 de oferte depuse \u00een Sistemul Electronic de Achizi\u021bii Publice pentru execu\u021bia lucr\u0103rilor de amenajare a digurilor \u00een\u2026<\/p>\n","protected":false},"author":1,"featured_media":7824,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-7823","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/posts\/7823","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7823"}],"version-history":[{"count":1,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/posts\/7823\/revisions"}],"predecessor-version":[{"id":7825,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/posts\/7823\/revisions\/7825"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=\/wp\/v2\/media\/7824"}],"wp:attachment":[{"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7823"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7823"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/crisuri.rowater.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7823"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}